BP116936 - 6 Maki Road - Addition to Amenities Building -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP116936 - 6 Maki Road - Addition to Amenities Building -- Scanned | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 6 Maki Road - Addition to Amenities Building -- Scanned |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP116936 |
Date Application Submitted: | February 01, 2012 |
Application Description: | Part 9 Building. Addition to existing. Additional floor area added = 84.78m2. . Addition of an office/canteen (D occupancy) with second storey storage area for existing residential dwelling unit use only. Conversion of the existing canteen area to quilting room. A2 with low occupant load classified as Group D per 3.1.2.6 a, b and c. with an Occupant Load of 30. Includes conversion a portion of the existing recreation room to a storage room. Building is an existing Part 9 building Fire separation upgrades are required as shown on the approved plans. 45 minute fire resistance rating on floors, roof assemblies and supporting construction. |
Application Status: | COMPLETED |
Permit Value: | $50,000.00 |
Builder: | NANAIMO DELTA PROPERTIES LTD |
Issued Date: | July 18, 2012 |
File Close Date: | March 27, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
6 MAKI ROAD | AR1 , PRC1 , R11 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-03-27 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.