BP116879 - 718 Wentworth Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116879 - 718 Wentworth Street
Neighbourhood: Downtown/Old City    
Street Address: 718 Wentworth Street
Type of Application: Single / Two Family Alteration
File Number: BP116879
Date Application Submitted: December 23, 2011
Application Description: Raise house, create secondary suite in partially finished basement. Install foundation for future garage.

Revision: Sept 18, 2013-- Permit scope changed to complete attic room (Master bed and ensuite). New truss, beam and height survey documents received.
Application Status: COMPLETED
Permit Value: $79,780.37
Building Area: 43.40 M2
467.15 ft2
Builder: PHEASANT HILL HOMES LTD
Issued Date: January 16, 2012
File Close Date: January 15, 2016
Expiry Date: January 16, 2016

Associated Properties

Address Zone More
718 WENTWORTH STREET R14 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

CANCELLED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2016-01-15

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.