BP116833 - 411 Dunsmuir -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP116833 - 411 Dunsmuir -- Scanned | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 411 Dunsmuir -- Scanned |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP116833 |
Date Application Submitted: | December 05, 2011 |
Application Description: | New City Hall Annex - Building Description, Part 3, Governing article, 3.2.2.54, Office building, Group D, Three storeys with Parking Garage, Group F3 on ~ half of the 1st storey. Building sprinklered with fire alarm. First storey, Group D = 792 m2 plus Group F3 = 788 m2; Second Storey, Group D, 1542 m2; Third Storey = 1672 m2 . Gross Floor area (Group D) = 4006 m2 plus Parking Garage (Group F3) = 788 m2. Floor assemblies and load bearing non-combustible construction as per 3.2.2.54; Exits = 45 min. FRR/FS; 1.5 hr FRR/FS between F3 and Group D. 45 metre TD. Elevator and machine room 45 min FRR/FS; Janitor room FS, Occupant load = 430 persons, Accessible for persons with disabilities. North and south wall face = 1 hr FRR with Non- combustible cladding. Max. UPO; Alternative solutions see conditions. |
Application Status: | COMPLETED |
Permit Value: | $8,800,000.00 |
Builder: | WINDLEY DEVELOPMENTS LTD |
Issued Date: | February 10, 2012 |
File Close Date: | December 10, 2012 |
Associated Properties
Address | Zone | More |
---|---|---|
411 DUNSMUIR STREET | DT7 | Property Report |
Process Steps
Task | Status |
---|---|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2012-12-10 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.