BP116775 - 625 Railway Avenue -- 625 Railway

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116775 - 625 Railway Avenue -- 625 Railway
Neighbourhood: Harewood    
Street Address: 625 Railway Avenue -- 625 Railway
Type of Application: Single / Two Family Dwelling
File Number: BP116775
Date Application Submitted: November 15, 2011
Application Description: For construction of a single family dwelling with secondary suite
(Engineered retaining walls are under building permit BP116861)
Revision, March 14, 2012.
1/ Delete Bathroom window.
2/ Add bedroom and window for egress. No spatial change.
3/Add roof over deck to create Porch. Truss docs attached.
4/ Change location of HWT. Add one HWT.
5/ Create Cold storage room in former "Mechanical Room".
6/ Move entry door from garage from top of stairs to new location between cold storage room and main dwelling.
7/ Add CO Detector to hallway adjacent to cold storage.
8/ Add Interconnected Ionized/CO detector in new lower Bedroom.
9/ Add bathroom with tub, basin, toilet in basement.
10/ Heat pump rough in located to accomodate future heat pump install at side of house. Furture heat pump install location O.K.d by BZ upon application and approval of BOV to locate at side of property as proposed on drawings.....MLB
Application Status: COMPLETED
Permit Value: $298,647.66
Building Area: 313.36 M2
3,372.98 ft2
Builder: TRL HOMES LTD
Issued Date: December 28, 2011
File Close Date: April 27, 2012

Associated Properties

Address Zone More
625 RAILWAY AVENUE R5 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PARTIAL
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

FAILED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

PASSED

2012-04-27

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.