BP116772 - 4700 Amblewood Phase 8 & 9 -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116772 - 4700 Amblewood Phase 8 & 9 -- Scanned
Neighbourhood: Rutherford    
Street Address: 4700 Amblewood Phase 8 & 9 -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP116772
Date Application Submitted: November 15, 2011
Application Description: Phase 8 - 1 Fourplex (4 dwelling units) , sprinklered,
Phase 9 - 2 Duplexes (4 dwelling units), sprinklered.

Type E - 2 Storey, Fourplex on crawl space, sprinklered
INSPECTIONS UNDER THIS PERMIT BP 116772
Unit 101 - 4460 Hedgestone Place - 118.31 m2
Unit 102 - 4460 Hedgestone Place - 112.08 m2
Unit 201 - 4460 Hedgestone Place - 108.65 m2
Unit 202 - 4460 Hedgestone Place - 112.00 m2

Type A - 1 Storey, Duplex on crawl space, sprinklered
FOR INSPECTIONS ONLY under BP116773
Unit 101 - 4406 Amblewood Lane - 148.48 m2, Garage 39.48 m2
Unit 102 - 4406 Amblewood Lane - 148.48 m2, Garage 39.48 m2

Type C - 1 Storey, Duplex on crawl space, sprinklered
FOR INSPECTIONS ONLY under BP116774
Unit 101 - 4400 Amblewood Lane - 135.17 m2, Garage 39 m2
Unit 102 - 4400 Amblewood Lane - 135.17 m2, Garage 39 m2
Application Status: COMPLETED
Permit Value: $1,104,755.38
Builder: WINDLEY CONTRACTING LTD
Issued Date: January 06, 2012
File Close Date: August 01, 2013

Associated Properties

Address Zone More
4700 AMBLEWOOD LANE R6 Property Report
101   4460 HEDGESTONE PLACE R6 Property Report
102   4460 HEDGESTONE PLACE R6 Property Report
201   4460 HEDGESTONE PLACE R6 Property Report
202   4460 HEDGESTONE PLACE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD PASSED

2013-08-01

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.