BP116699 - 4750 Rutherford (Alias: 4575 Uplands Drive) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116699 - 4750 Rutherford (Alias: 4575 Uplands Drive) -- Scanned | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 4750 Rutherford (Alias: 4575 Uplands Drive) -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP116699 |
| Date Application Submitted: | October 12, 2011 |
| Application Description: |
To construct a one storey slab on grade shell building for a future restaurant (Group A2 - Tim Hortons) and two retail units (Group E). REVISION 2012 June 14 - remove demising wall between CRU1 and CRU2 to create one shell unit in addition to the restraunt unit. Addressing to be A301 for the restaurant and A305 for the shell CRU. M Mark Sprinkler plans submitted and approved. 2012-Jun-18 RM. Building Classification 3.2.2.62, Group E (governing article), 531 m2, Sprinklered with fire alarm. Accessible for persons with disabilities The roof does not require a fire resistance rating. The underslab plumbing only for three universal washrooms is included in this permit. Design build |
| Application Status: | COMPLETED |
| Permit Value: | $629,310.00 |
| Builder: | KINETIC CONSTRUCTION LTD |
| Issued Date: | February 03, 2012 |
| File Close Date: | September 20, 2012 |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2012-09-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)