BP116663 - 3403 Barrington Road (3423 & 3429 Ocean Mist Place) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116663 - 3403 Barrington Road (3423 & 3429 Ocean Mist Place) -- Scanned | |
|---|---|
| Neighbourhood: | Linley Valley |
| Street Address: | 3403 Barrington Road (3423 & 3429 Ocean Mist Place) -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP116663 |
| Date Application Submitted: | September 26, 2011 |
| Application Description: |
Phase 3 , Block C - Duplex. Foundation completed under BP114531. Two storey, Part 9 Building. Sprinklered under Building Bylaw requirement, no fire alarm system installed. 3429 Ocean Mist Place, future strata lot 8 3423 Ocean Mist Place, future strata lot 9 |
| Application Status: | COMPLETED |
| Permit Value: | $301,707.00 |
| Builder: | HAZELWOOD HOLDINGS LTD |
| Issued Date: | November 04, 2011 |
| File Close Date: | February 18, 2013 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3429 OCEAN MIST PLACE | R6 | Property Report |
| 3423 OCEAN MIST PLACE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2013-02-18 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)