BP116662 - 216 White Court Way -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116662 - 216 White Court Way -- Scanned | |
|---|---|
| Neighbourhood: | Diver Lake | 
| Street Address: | 216 White Court Way -- Scanned | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP116662 | 
| Date Application Submitted: | September 26, 2011 | 
| Application Description: | Construction of a two story single family dwelling, slab on grade, attached garage and Secondary Suite Revision, June14th, 2012; Deleting one bedroom, mechanical room and one 2'0"x2'0"window on right side. Relocating three piece washroom, two hot water tanks and washer/dryer. Adding one 5'0"x4'0" window on left side. JDB. | 
| Application Status: | COMPLETED | 
| Permit Value: | $229,436.00 | 
| Building Area: | 226.70 M2 2,440.18 ft2 | 
| Builder: | G DATOFF & SONS BUILDING LTD | 
| Issued Date: | October 28, 2011 | 
| File Close Date: | July 23, 2012 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 216 WHITE COURT WAY | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PASSED | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | PARTIAL | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| STORM CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| SANITARY CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| WATER CONNECTION Pipe and Connection must be visable for inspection | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | FAILED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | FAILED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | PASSED 2012-07-20 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        