BP116459 - 110 Ashlar -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116459 - 110 Ashlar -- Scanned
Neighbourhood: University District    
Street Address: 110 Ashlar -- Scanned
Type of Application: Single / Two Family Alteration
File Number: BP116459
Date Application Submitted: July 22, 2011
Application Description: Addition, slab on grade, to front and side of single family dwelling
Boiler for radient floor piping will be added later ensure backflow protection for water system
Application Status: COMPLETED
Permit Value: $31,492.00
Building Area: 65.40 M2
703.96 ft2
Issued Date: August 19, 2011
File Close Date: April 05, 2013

Associated Properties

Address Zone More
110 ASHLAR AVENUE R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PASSED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2013-04-04

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.