BP116354 - 1675 Crescent View Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP116354 - 1675 Crescent View Drive | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 1675 Crescent View Drive |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP116354 |
Date Application Submitted: | April 29, 2011 |
Application Description: |
1675 Crescent View Drive -37 unit multi-family development. Building 6, Five-plex, Type 'B' building: Unit B101 -117.43 m2, Unit B102 -116.69 m2, Unit B103 -117.43 m2, Unit B104 -116.69 m2, Unit B105 -117.43 m2. (Total area 585.67 m2) Building 1 ~ BP116350, Inspections only Building 2 ~ BP116351, Inspections only Building 3 ~ BP116352, Inspections only Building 4 ~ BP116160, Building permit information Building 5 ~ BP116353, Inspections only Building 6 ~ BP116354, Inspections only Building 7 ~ BP116355, Inspections only Building 8 ~ BP116356, Inspections only |
Application Status: | COMPLETED |
Builder: | DUECK GENERAL CONTRACTING |
Issued Date: | July 13, 2011 |
File Close Date: | July 17, 2013 |
Associated Properties
Address | Zone | More |
---|---|---|
501 1675 CRESCENT VIEW DRIVE | R8 | Property Report |
502 1675 CRESCENT VIEW DRIVE | R8 | Property Report |
503 1675 CRESCENT VIEW DRIVE | R8 | Property Report |
504 1675 CRESCENT VIEW DRIVE | R8 | Property Report |
505 1675 CRESCENT VIEW DRIVE | R8 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2013-07-17 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.