BP116268 - 568 Drake Street -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116268 - 568 Drake Street -- Scanned
Neighbourhood: Newcastle/Brechin    
Street Address: 568 Drake Street -- Scanned
Type of Application: Single / Two Family Alteration
File Number: BP116268
Date Application Submitted: June 03, 2011
Application Description: Three storey addition with attached garage (secondary suite above).
Revision: Increased size of secondary suite,add deck landing and turn deck stairs. Add LVL flush beam in garage ceiling framing(bolt to 4 ply 2x12 D-Fir beam existing). Revised May 15, 2011 - Structural Engineer added to permit conditions for column foundations in basement.
Revision, August 09, 2012, Existing batroom in basement to be removed and replaced with new bathroom. All plumbing roughins including underslab works are to be inspected before covering with concrete and/or drywall.....MLB

Revision: Revised plans with multiple changes. Windows, added and deleted. Changes to layout on both floors. Location of heat pump indicated. Bathrooms changed on main floor and second floor. Adition of hwt, two wash tubs and one bath tub.Landing around back changed as well. All plan information has been put on one set. August29, 2012. JB
Application Status: COMPLETED
Permit Value: $247,483.46
Building Area: 152.36 M2
1,639.99 ft2
Issued Date: December 20, 2011
File Close Date: November 16, 2012

Associated Properties

Address Zone More
568 DRAKE STREET R5 Property Report

Process Steps

Task Status
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

COMPLETED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
FOOTING/FORMS

Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PARTIAL
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
ROUGH IN PLUMBING

Rough In plumbing must be complete including water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete.

FAILED
FRAMING

Rough in plumbing & electrical must be complete.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2012-11-16

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.