BP116182 - 17 Strickland Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116182 - 17 Strickland Street | |
|---|---|
| Neighbourhood: | South End |
| Street Address: | 17 Strickland Street |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP116182 |
| Date Application Submitted: | May 09, 2011 |
| Application Description: |
To construct an unheated sunroom addition & ramp/stairs at rear of house. Approved BOV571 for reduced side yard setback from 1.5m (4.92ft) to 1.23m (4.04ft). Revision May 25, 2011: - adding strip footings under rear wall - changing to 2" X 10" floor joists AG Revision Aug. 16, 2011: - revise size of deck and add roof - delete jog in wall and add/change windows AG Revision: June 5th, 2013. -revise size of deck and adding a bit more roof. |
| Application Status: | COMPLETED |
| Permit Value: | $11,431.43 |
| Building Area: |
23.55 M2 253.49 ft2 |
| Issued Date: | May 17, 2011 |
| File Close Date: | May 12, 2015 |
| Expiry Date: | May 17, 2015 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 17 STRICKLAND STREET | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2015-05-12 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)