BP116146 - 2055 Lakeside Drive - SCANNED
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116146 - 2055 Lakeside Drive - SCANNED | |
|---|---|
| Neighbourhood: | Chase River |
| Street Address: | 2055 Lakeside Drive - SCANNED |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP116146 |
| Date Application Submitted: | April 26, 2011 |
| Application Description: | Construction of attached garage with secondary suite above and heated breezeway (deck above). |
| Application Status: | COMPLETED |
| Permit Value: | $135,000.00 |
| Building Area: |
86.86 M2 934.95 ft2 |
| Issued Date: | May 16, 2011 |
| File Close Date: | July 26, 2013 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2055 LAKESIDE DRIVE | R1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
FAILED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2013-07-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)