BP116106 - 5302 Royal Sea View -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116106 - 5302 Royal Sea View -- Scanned
Neighbourhood: North Slope    
Street Address: 5302 Royal Sea View -- Scanned
Type of Application: Single / Two Family Dwelling
File Number: BP116106
Date Application Submitted: April 13, 2011
Application Description: For construction of a two level single family dwelling with a secondary suite and a two car garage.
Revision, May 24, 2011. New Structural Engineering Drawings for whole building supplied. Old drawings deleted and kept on file for reference. MLB
Revision, Sept 22, 2011 Add washing machine in basement (as per RM's instructions) MLB
Revision, Sept 28, 2011, move suite Kitchen sink R/I add closet to kitchen.
Revision, October 17, 2011. New HPO issued with Owner/Builder Designation. MLB
Revision October 18, 2011, deck size on flanking side enlarged . Location Survey shows. o.k.See survey in attachments....MLB
Application Status: COMPLETED
Permit Value: $340,000.00
Building Area: 283.63 M2
3,052.96 ft2
Issued Date: October 17, 2011
File Close Date: January 17, 2012

Associated Properties

Address Zone More
5302 ROYAL SEA VIEW R5 Property Report

Process Steps

Task Status
FOOTING / FORMS

Inspection of forms prior to any concrete being poured

PASSED
PERIMETER DRAIN

For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering

PASSED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete

PASSED
STORM CONNECTION

Pipe and Connection must be visible for inspection

PASSED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection

PASSED
WATER CONNECTION

Pipe and Connection must be visable for inspection

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

CANCELLED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection

PASSED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

FAILED
OCCUPANCY-OLD

Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish

PASSED

2012-01-17

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.