BP116100 - 2400 Labieux (Parent) Ph 2 - 2405, 2407 Brandon Way (Duplex A) -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116100 - 2400 Labieux (Parent) Ph 2 - 2405, 2407 Brandon Way (Duplex A) -- Scanned
Neighbourhood: Diver Lake    
Street Address: 2400 Labieux (Parent) Ph 2 - 2405, 2407 Brandon Way (Duplex A) -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP116100
Date Application Submitted: October 26, 2010
Application Description: 2400 Labieux Road (Parent) - Sprinklered, 29 multi-family unit development 13 duplexes, 1 triplex. Phase 2 includes 3 duplexes. 6 units @ 1260 sq.ft. (702.35 m2)

2405/2407 Brandon Way - Type A ~ INSPECTIONS ONLY (BP116100)

See BP 115699 for Building Permit Information
Application Status: COMPLETED
Builder: OM DEVELOPMENT INC
Issued Date: April 15, 2011
File Close Date: March 30, 2012

Associated Properties

Address Zone More
2405 BRANDON WAY R6 Property Report
2407 BRANDON WAY R6 Property Report
2400 LABIEUX ROAD R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
STORM CONNECTION

Pipe and connection must be visible for inspection.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
OCCUPANCY-OLD PASSED

2012-03-29

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.