BP116052 - 430 Mckay Avenue -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP116052 - 430 Mckay Avenue -- Scanned | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 430 Mckay Avenue -- Scanned |
Type of Application: | Single / Two Family Alteration |
File Number: | BP116052 |
Date Application Submitted: | March 29, 2011 |
Application Description: |
To construct a bedroom and bathroom addition to an existing single family dwelling. Revision Sept 08, 2011 Adding drawing to plans showing rainscreen, bugscreen, siding details. Dwg shows pony wall over fdn. MLB |
Application Status: | COMPLETED |
Permit Value: | $23,123.48 |
Building Area: |
18.74 M2 201.72 ft2 |
Issued Date: | April 26, 2011 |
File Close Date: | December 06, 2011 |
Associated Properties
Address | Zone | More |
---|---|---|
430 MCKAY AVENUE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
SCHEDULED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
SCHEDULED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-12-06 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.