BP116048 - 1700 Centennary Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116048 - 1700 Centennary Drive | |
|---|---|
| Neighbourhood: | Chase River |
| Street Address: | 1700 Centennary Drive |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP116048 |
| Date Application Submitted: | March 25, 2011 |
| Application Description: |
Attached shop with secondary suite above. Revision Aug. 10, 2011 (new plans submitted): - removing interior staircase - adding woodstove - changing mechanical room to storage room Revision Oct 21-2011 Add laundry tub to storage room off laundry. - suite floor layout changed - changing doors and windows AG Revision on October 7, 2011 replace existing deck guards. DKF |
| Application Status: | COMPLETED |
| Permit Value: | $200,000.00 |
| Building Area: |
143.53 M2 1,544.94 ft2 |
| Builder: | PHEASANT HILL HOMES LTD |
| Issued Date: | April 15, 2011 |
| File Close Date: | October 21, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1700 CENTENNARY DRIVE | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-10-21 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)