BP116014 - 3721 Shenton Road -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP116014 - 3721 Shenton Road -- Scanned | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 3721 Shenton Road -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP116014 |
| Date Application Submitted: | March 11, 2011 |
| Application Description: |
Office Building, Part 9, Building Area (BCBC = 238 m2), 2 storey plus basement as defined by Architect. 2 suites only. 45 min. FRR/FS continuous (see alternative solution) between the two suites. 45 min FRR/FS bewtween floors. Basement subsidiary to the each of the suites. Exiting meets 9.9.4.7. Single exit from basement. Basement = 206.55 m2 , 1st storey (main) = 237.8 m2, 2nd storey = 221.7 m2. revision on September 20, 2011 |
| Application Status: | HOLDBACK |
| Permit Value: | $638,000.00 |
| Builder: | WINDLEY HOLDINGS CO LTD |
| Issued Date: | May 30, 2011 |
| File Close Date: | January 13, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 101 3721 SHENTON ROAD | COR1 | Property Report |
| 102 3721 SHENTON ROAD | COR1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
| OCCUPANCY-OLD | CANCELLED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2012-01-13 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)