BP116014 - 3721 Shenton Road -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP116014 - 3721 Shenton Road -- Scanned
Neighbourhood: Diver Lake    
Street Address: 3721 Shenton Road -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP116014
Date Application Submitted: March 11, 2011
Application Description: Office Building, Part 9, Building Area (BCBC = 238 m2), 2 storey plus basement as defined by Architect. 2 suites only. 45 min. FRR/FS continuous (see alternative solution) between the two suites. 45 min FRR/FS bewtween floors. Basement subsidiary to the each of the suites. Exiting meets 9.9.4.7. Single exit from basement. Basement = 206.55 m2 , 1st storey (main) = 237.8 m2, 2nd storey = 221.7 m2.
revision on September 20, 2011
Application Status: HOLDBACK
Permit Value: $638,000.00
Builder: WINDLEY HOLDINGS CO LTD
Issued Date: May 30, 2011
File Close Date: January 13, 2012

Associated Properties

Address Zone More
101   3721 SHENTON ROAD COR1 Property Report
102   3721 SHENTON ROAD COR1 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PARTIAL
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2012-01-13

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.