BP115970 - 2353 Leighton Road -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP115970 - 2353 Leighton Road -- Scanned
Neighbourhood: Westwood    
Street Address: 2353 Leighton Road -- Scanned
Type of Application: Accessory Building
File Number: BP115970
Date Application Submitted: February 24, 2011
Application Description: Detached 24' X 14' insulated shop with wash basin and toilet.

Revision May 18, 2011:
- changing location of windows/doors
- changing bathroom location AG
Application Status: COMPLETED
Permit Value: $16,566.95
Building Area: 31.22 M2
336.05 ft2
Issued Date: March 04, 2011
File Close Date: August 12, 2011
Expiry Date: March 04, 2013

Associated Properties

Address Zone More
2353 LEIGHTON ROAD R5 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
SANITARY CONNECTION

Pipe and Connection must be visible for inspection.

CANCELLED
STORM CONNECTION

Pipe and Connection must be visible for inspection

CANCELLED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2011-08-12

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.