BP115962 - 450 Alpen Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115962 - 450 Alpen Way | |
|---|---|
| Neighbourhood: | Harewood |
| Street Address: | 450 Alpen Way |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP115962 |
| Date Application Submitted: | February 22, 2011 |
| Application Description: |
For construction of a single family dwelling with secondary suite. Revision completed:05-03-11 KM Add hallway and new exit door. Add closet and change rec room to bedroom. Add 3 pc.bathroom. Add 6' lower cabinets and bar sink. Add fire rated door to suite. New window to right elevation 1' x 6' . Revision for Main Floor - May 13, 2011: - revise ensuite layout & add sink - relocate w/d & add laundry tub - enclose covered deck into heated space - change fireplace location - add bumpout (hutch) AG |
| Application Status: | COMPLETED |
| Permit Value: | $262,591.00 |
| Building Area: |
280.47 M2 3,018.95 ft2 |
| Builder: | 0853977 BC LTD |
| Issued Date: | March 01, 2011 |
| File Close Date: | June 29, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 450 ALPEN WAY | R10 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2011-06-29 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)