BP115856 - 190 Nicol Street / 706 Milton Street -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP115856 - 190 Nicol Street / 706 Milton Street -- Scanned
Neighbourhood: South End    
Street Address: 190 Nicol Street / 706 Milton Street -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP115856
Date Application Submitted: January 05, 2011
Application Description: Commercial Development - mixed use - Part 9 shell building, combustible construction, sprinklered.

Revision -Aug 2/11 ~ lower attic detail now contains spray foam insulation to underside of roof sheathing so attic space is heated to prevent sprinkler lines from freezing. GHL has provided an alternative solution for sprinkler requirements and truss protection through mechanical shaft. Schedule B provided, field memos required.
2 hour fire separtion between retail and residential occupancy required. See GHL Alternative Solution.
The scope of the mechanical installation has been amended. Refer to the Conditions of Permit Issuance.
Rough-in plumbing for 3 residential units added to shell.

2 storey with Group E (321.44 m2) lower floor occupancy and 1 residential suite (Group C, 235.88 m2) on upper level.
Future Building Permits required for signage and development of all floor areas. HPO documentation will be required for residential unit permit.
Application Status: COMPLETED
Permit Value: $500,000.00
Builder: MINHAS GUR
Issued Date: April 07, 2011
File Close Date: December 15, 2011

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

CANCELLED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

FAILED
PLUMBING FINAL-OLD

All fixtures must be in place.

FAILED
OCCUPANCY-OLD FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2011-12-15

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.