BP115853 - Building B - 4341 Boban Drive -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115853 - Building B - 4341 Boban Drive -- Scanned | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | Building B - 4341 Boban Drive -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP115853 |
| Date Application Submitted: | January 04, 2011 |
| Application Description: | One storey addition of 658.7 m2 to an existing 2 storey F2 building that was 321.8 m2 on first storey and 172.8 m2 on the second storey. With the addition the first storey = 980.5 m2 ((BCBC 2006 building area)) and the second storey remains at 172.8 m2 for a total floor area of 1153.3m2. New building classification 3.2.2.70 (F2), (meets 3.2.8.6 interconnected floor space) 2 storeys, new sprinkler system, fire alarm system, 45 min. floor assemblies and load bearing supports. New 45 min FRR/FS wall assembly. This permit is for the shell only. Suite separations not under this permit Permits are required for the creation of the CRU's, not under this permit. Rough in plumbing under this permit. |
| Application Status: | COMPLETED |
| Permit Value: | $575,000.00 |
| Builder: | WINDLEY CONTRACTING LTD |
| Issued Date: | March 29, 2011 |
| File Close Date: | January 31, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4341 BOBAN DRIVE | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2012-02-01 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)