BP115827 - 558 Albert Units 1 to 4. -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP115827 - 558 Albert Units 1 to 4. -- Scanned
Neighbourhood: Downtown/Old City    
Street Address: 558 Albert Units 1 to 4. -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP115827
Date Application Submitted: December 20, 2010
Application Description: 4-plex Part 9 multi-family building. 248 m2 living space with partial crawlspace and basement storage.
45min FRR/FS plus STC rating of 50 is required for suite separations.

Separate pemit required for upgrades to existing building on property. (2012-01-10 A separate permit is not required as this was dealt with when TW inspected the building. A notice has gone on title for this existing building.)

Revision Aug 17/11 -change to front common entry, changes to rear deck, changing from french doors to sliders (approved by planning) MV

New hydraulic calcs and sprinkler plans submitted and approved Sept. 9. VS

3.5' X 9' Electrical Room addition added to existing building. Jan 04 2012 BAL
Application Status: HOLDBACK
Permit Value: $371,425.90
Issued Date: April 28, 2011
File Close Date: May 04, 2012

Associated Properties

Address Zone More
554 ALBERT STREET DT8 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

FAILED
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

CANCELLED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

FAILED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

FAILED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

FAILED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2012-05-04

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.