BP115827 - 558 Albert Units 1 to 4. -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115827 - 558 Albert Units 1 to 4. -- Scanned | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 558 Albert Units 1 to 4. -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP115827 |
| Date Application Submitted: | December 20, 2010 |
| Application Description: |
4-plex Part 9 multi-family building. 248 m2 living space with partial crawlspace and basement storage. 45min FRR/FS plus STC rating of 50 is required for suite separations. Separate pemit required for upgrades to existing building on property. (2012-01-10 A separate permit is not required as this was dealt with when TW inspected the building. A notice has gone on title for this existing building.) Revision Aug 17/11 -change to front common entry, changes to rear deck, changing from french doors to sliders (approved by planning) MV New hydraulic calcs and sprinkler plans submitted and approved Sept. 9. VS 3.5' X 9' Electrical Room addition added to existing building. Jan 04 2012 BAL |
| Application Status: | HOLDBACK |
| Permit Value: | $371,425.90 |
| Issued Date: | April 28, 2011 |
| File Close Date: | May 04, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 554 ALBERT STREET | DT8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
FAILED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
FAILED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2012-05-04 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)