BP115707 - 101- 1930 Island Diesel

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP115707 - 101- 1930 Island Diesel
Neighbourhood: Northfield    
Street Address: 101- 1930 Island Diesel
Type of Application: Commercial / Multi-Res Alteration
File Number: BP115707
Date Application Submitted: October 28, 2010
Application Description: Install a window and partitions on second floor.
Work started without permit Stop Work Notice posted. Double permit fee to be paid.

Part 9, F2 (Industrial) building with subsidiary Group D , 2 storey building, fire alarm, sprinklered, combustible constr. permitted. Building area by code, Main floor= 390.18m2, 2nd floor = 60.4 m2. 45 min FRR/FS demising walls between the Unit #101 and the remainder of the building. Unit #101 has a second floor with a single exit and is provided with a 45min FRR/FS exit enclosure `with 20 min ULC labelled doors, the flr assembly is 45 min FRR/FS. Universal washroom is provided for 1st flr of Unit # 101, 2nd flr washroom also provided. Exterior S. wall requires a 2 hr FRR. Plumbing through the 45 min floor require fire stopping system.
Application Status: COMPLETED
Permit Value: $6,000.00
Builder: ALAIR HOMES
Issued Date: December 31, 2010
File Close Date: February 25, 2011

Associated Properties

Address Zone More
101   1930 ISLAND DIESEL WAY I3 Property Report

Process Steps

Task Status
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2011-02-25

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.