BP115639 - 561 Eighth Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP115639 - 561 Eighth Street | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 561 Eighth Street |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP115639 |
Date Application Submitted: | September 28, 2010 |
Application Description: |
Construct a two storey single family dwelling + secondary suite on slab with built-in double garage. Revision dated Nov. 18, 2011: - revised basement layout with bar sink AG Revision completed: 03-08-11 KM Deleted bump out to shared washroom at bedroom 2 & 3 on main floor. Extended cantilever @ living/dining room. Added 5' x 7' window. Relocated walk in door to garage. Added closet to hallway by utility room. Bathroom layout to suite reversed. |
Application Status: | COMPLETED |
Permit Value: | $310,427.92 |
Building Area: |
328.88 M2 3,540.03 ft2 |
Builder: | MINHAS GUR |
Issued Date: | November 19, 2010 |
File Close Date: | October 21, 2011 |
Associated Properties
Address | Zone | More |
---|---|---|
561 EIGHTH STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
CANCELLED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
CANCELLED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2011-10-21 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.