BP115635 - 109 - 6596 Applecross Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115635 - 109 - 6596 Applecross Road | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 109 - 6596 Applecross Road |
| Type of Application: | Leasehold Improvements |
| File Number: | BP115635 |
| Date Application Submitted: | September 27, 2010 |
| Application Description: |
Lasik MD - Unit 109 Tenant Improvement This permit is for a Group D, 2092 sq.ft. (194.35 m2), two exits required as travel distance >25 m. Sprinkler modifications. Installing two washrooms in compliance with 3.8 with one washroom being universal. Ensure fire stopping at any penetration of rated fire separations. The 45 min FRR/FS roof-ceiling assembly under base building, Vertical demising wall to terminate at the 45min FRR/FS roof/ceiling assembly , 2 hr. FRR/FS on the demising wall installed under the base building BP112591 as part of an alternative solution. Separate permit required for signage. Bldg C: - 6596 Applecross - 1493.46 m2 - Group E/A2 - 3.2.2.27/ 3.2.2.62, Sprinklered, Fire Alarm, combustible, N & E exposed walls face 1 hr FRR, Suite separation = 45 min. FRR/FS to underside of 45 min. FRR/FS Roof Assembly and 2 hr. FRR/FS to roof sheathing (by alternative solution (GHL) between A2 (Pho Boi) and adjacent occupancies. 1 hr FRR/FS for service rooms, |
| Application Status: | COMPLETED |
| Permit Value: | $105,000.00 |
| Issued Date: | November 04, 2010 |
| File Close Date: | December 23, 2010 |
| Expiry Date: | November 05, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6596 APPLECROSS ROAD | CC4 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD |
PASSED
2010-12-23 |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2010-12-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)