BP115504 - 4341 Boban Drive Bldg A (alias 4337 Boban Drive) -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115504 - 4341 Boban Drive Bldg A (alias 4337 Boban Drive) -- Scanned | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 4341 Boban Drive Bldg A (alias 4337 Boban Drive) -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP115504 |
| Date Application Submitted: | August 17, 2010 |
| Application Description: |
Shell Building - 1117 m2 "F2" occupancy. A separate permit will be required for future tenant improvements. Group F2, 3.2.2.70., 1117m2, one-storey, sprinklered, non-combustible (combustible ok) building with 116.7 m2 mezzanine {interconnected floor space [3.2.8.2.(6)] for second floor}. Loadbearing supports/floor require 3/4 hour FRR. Structural members, including beams, columns and arches, that are placed wholly or partly outside the exterior face of a building and are less than 3 m from the property line or center line of a street require a FRR of not less than 1 hour. |
| Application Status: | HOLDBACK |
| Permit Value: | $500,000.00 |
| Builder: | WINDLEY INVESTMENTS LTD |
| Issued Date: | October 28, 2010 |
| File Close Date: | September 26, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 4341 BOBAN DRIVE | I2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-09-26 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.