BP115491 - 446 Milton Bldg A #1 446 Milton SL1-2 EPS422 -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115491 - 446 Milton Bldg A #1 446 Milton SL1-2 EPS422 -- Scanned | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 446 Milton Bldg A #1 446 Milton SL1-2 EPS422 -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP115491 |
| Date Application Submitted: | August 11, 2010 |
| Application Description: |
Four building Multi-Family development (7 units). Part 9 - 3 storey buildings with a 2 hour fire separation required between garage and dwelling units for Building 'C'. Building 'A' slab-on-grade ~ 2 units total = 2061 sq. ft, Building 'B' slab-on-grade ~ 2 units total = 3986 sq. ft, Building 'C' on partial crawlspace ~ 2 units = 2682 sq. ft, Building 'D' on partial crawlspace ~ 1 unit = 1358 sq. ft. Building B - inspections under BP115629 Building C - inspections under BP115630 Building D - inspections under BP115631 Revision ~December 2/10 - change from TJI to 2x12 joists, change framing in electric room, rainscreen details. |
| Application Status: | COMPLETED |
| Permit Value: | $1,200,000.00 |
| Builder: | MICHAEL PARKER CONSTRUCTION LTD |
| Builder: | WILDROCK VENTURES LTD |
| Issued Date: | September 24, 2010 |
| File Close Date: | July 07, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 2 446 MILTON STREET | R15 | Property Report |
| 446 MILTON STREET | R15 | Property Report |
| 1 446 MILTON STREET | R15 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2011-07-08 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)