BP115287 - 101-319 Selby Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP115287 - 101-319 Selby Street
Neighbourhood: Downtown/Old City    
Street Address: 101-319 Selby Street
Type of Application: Leasehold Improvements
File Number: BP115287
Date Application Submitted: June 14, 2010
Application Description: Central Vancouver Island Multicultural Society (CVIMS) - New Complete and occupy - Offices, Classrooms, Daycare. X reference permit, BP 115091 for the completion of the shell (all FRR/FS completed under shell permit and sprinklers). All finishing completed under this permit

Main floor = 423 m2 ; Upper floor = 371.6 m2. Total area = 794.6 m2. Group A2, Group D. Sprinklered, fire alarm, new female and male washrooms and two universal washrooms.

Existing building description from BP115091. (Building to be sprinklered with fire alarm system under BP115091.Existing + addition 743.2m2, 2 storey, sprinklered with fire alarm, combustible building, Building Classification A-2 / D - 3.2.2.26., 3/4 hr. floor assemblies, except where not required between residential floors and where occupancy separation are more restrictive.) 1 hr. suite separation.

REVISION 1 (29/03/11): minor changes to floor plans as indicated

Application Status: COMPLETED
Permit Value: $165,000.00
Building Area: 794.60 M2
8,552.99 ft2
Builder: MIRANDA CONSTRUCTION LTD
Issued Date: March 30, 2011
File Close Date: May 27, 2011
Expiry Date: March 29, 2013

Associated Properties

Address Zone More
319 SELBY STREET DT2 Property Report

Process Steps

Task Status
UNDERSLAB PLUMBING

Complete underslab plumbing must be visible.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

CANCELLED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
FINAL-OLD

Final Approval as per requirements on plans.

CANCELLED
FINAL-OLD

Final Approval as per requirements on plans.

FAILED
FINAL-OLD

Final Approval as per requirements on plans.

PASSED

2011-05-27

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.