BP115287 - 101-319 Selby Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP115287 - 101-319 Selby Street | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 101-319 Selby Street |
| Type of Application: | Leasehold Improvements |
| File Number: | BP115287 |
| Date Application Submitted: | June 14, 2010 |
| Application Description: |
Central Vancouver Island Multicultural Society (CVIMS) - New Complete and occupy - Offices, Classrooms, Daycare. X reference permit, BP 115091 for the completion of the shell (all FRR/FS completed under shell permit and sprinklers). All finishing completed under this permit Main floor = 423 m2 ; Upper floor = 371.6 m2. Total area = 794.6 m2. Group A2, Group D. Sprinklered, fire alarm, new female and male washrooms and two universal washrooms. Existing building description from BP115091. (Building to be sprinklered with fire alarm system under BP115091.Existing + addition 743.2m2, 2 storey, sprinklered with fire alarm, combustible building, Building Classification A-2 / D - 3.2.2.26., 3/4 hr. floor assemblies, except where not required between residential floors and where occupancy separation are more restrictive.) 1 hr. suite separation. REVISION 1 (29/03/11): minor changes to floor plans as indicated |
| Application Status: | COMPLETED |
| Permit Value: | $165,000.00 |
| Building Area: |
794.60 M2 8,552.99 ft2 |
| Builder: | MIRANDA CONSTRUCTION LTD |
| Issued Date: | March 30, 2011 |
| File Close Date: | May 27, 2011 |
| Expiry Date: | March 29, 2013 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 319 SELBY STREET | DT2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2011-05-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)