Search Again| BP115179 - 321 Selby -- Scanned | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 321 Selby -- Scanned |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP115179 |
| Date Application Submitted: | May 11, 2010 |
| Application Description: | Rehabilitation of the Nanaimo Train Station - Phase 2 -Heritage Building, Table A1.1.1.1 applies. Part 3 building. Group A, Division 2 , 3.2.2.26. Building area 335m2 - 2 storey /basement. Basement is ancillary to the A2 suite. 1 hr. FRR/FS for suite separation most restrictive, no roof rating. Sprinklered by bylaw. Interconnected floor space complies with 3.2.8.2.(6). Alternative solution for egress. Separate permit required for tenant improvements. Washrooms under this permit. |
| Application Status: | HOLDBACK |
| Permit Value: | $1,280,000.00 |
| Building Area: |
474.90 M2 5,111.78 ft2 |
| Builder: | TECTONICA MANAGEMENT INC |
| Issued Date: | August 23, 2010 |
| File Close Date: | June 21, 2012 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 321 SELBY STREET | DT2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
|
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2012-06-21 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)