| Street Address: | 184 Piper Cres |
| Type of Application: | Single / Two Family Alteration |
| File Number: | BP114980 |
| Date Application Submitted: | March 23, 2010 |
| Application Description: | Replace existing underdeck enclosure (existing posts and beam to be removed) with new foundation and exterior frame wall to create storage. Existing deck to be cut back at corner to comply with sideyard setback requirement of 1.5 meters. |
| Application Status: | COMPLETED |
| Permit Value: | $1,000.00 |
| Builder: | AFM RENOVATIONS (INDUSTRIES) |
| Issued Date: | April 28, 2010 |
| File Close Date: | October 21, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 184 PIPER CRESCENT | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
COMPLETED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2010-10-20 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)