BP114964 - 126 Halburton
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114964 - 126 Halburton | |
|---|---|
| Neighbourhood: | South End |
| Street Address: | 126 Halburton |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP114964 |
| Date Application Submitted: | March 17, 2010 |
| Application Description: |
Phase 2. Upgrade to 19 Residential Suites. Upgrade includes refurbishing existing bathrooms with new fixtures. Repairing existing plumbing and electrical. New 20 min. FPR suite doors. Replacing windows. Repairing existing fire separations. New hard wired smoke detectors. New laundry room. Painting all suites. All doors in public corridor to be a 20 min. FPR and self closing. Replacing exterior exit stairs from the second and from the third storey with new stairs. New exits doors on third storey and new exit door on second storey into the central exit facility. xreference BP115027 for new sprinkler system. xreference BP 113658 for Phase 1 Existing Hotel/Commercial Building, Part 3 Three stories with partial basement, Group C with existing Group A2/ Group D on Main Floor and Group D suite on second floor. Fire alarm system, sprinklered. Nonconforming existing A2. |
| Application Status: | COMPLETED |
| Permit Value: | $262,000.00 |
| Building Area: |
437.00 M2 4,703.82 ft2 |
| Builder: | W J MURPHY CONTRACTING |
| Issued Date: | April 15, 2010 |
| File Close Date: | June 02, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 126 HALIBURTON STREET | CC1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-06-02 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)