BP114789 - 2157 Ridgemont Place Bldg 4 Fourplex -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP114789 - 2157 Ridgemont Place Bldg 4 Fourplex -- Scanned
Neighbourhood: Diver Lake    
Street Address: 2157 Ridgemont Place Bldg 4 Fourplex -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP114789
Date Application Submitted: January 26, 2010
Application Description: Townhouse Development - Phase 3 - 1 fourplex. The building is a two storey, sprinklered, on a crawlspace with a 1 hr. fire separation between suites in the fourplex . On-site servicing under permit BP113075.

2157 Ridgemont Place - 442.20 m2 fourplex
101 - 2157 - Ridgemont Place 110.55 m2 gross floor area
102 - 2157 - Ridgemont Place 110.55 m2 gross floor area
103 - 2157 - Ridgemont Place 110.55 m2 gross floor area
104 - 2157 - Ridgemont Place 110.55 m2 gross floor area
call for inspections under BP114789
Application Status: COMPLETED
Permit Value: $499,241.40
Builder: BLACKCOMB DEVELOPMENTS LTD
Issued Date: February 25, 2010
File Close Date: August 30, 2010

Associated Properties

Address Zone More
101   2157 RIDGEMONT PLACE R10 Property Report
102   2157 RIDGEMONT PLACE R10 Property Report
103   2157 RIDGEMONT PLACE R10 Property Report
104   2157 RIDGEMONT PLACE R10 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

FAILED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2010-08-30

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.