BP114685 - 2160 Ridgemont Place Bldg 9 Duplex -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114685 - 2160 Ridgemont Place Bldg 9 Duplex -- Scanned | |
|---|---|
| Neighbourhood: | Diver Lake |
| Street Address: | 2160 Ridgemont Place Bldg 9 Duplex -- Scanned |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP114685 |
| Date Application Submitted: | June 26, 2008 |
| Application Description: |
Townhouse Development - Phase 2 2160 Ridgemont Place - 221.10 m2 duplex 101 - 2164 - Ridgemont Place - 110.55 m2 gross floor area 102 - 2164 - Ridgemont Place - 110.55 m2 gross floor area call for inspections under BP114684 |
| Application Status: | COMPLETED |
| Permit Value: | $1,006,561.84 |
| Builder: | BLACKCOMB DEVELOPMENTS LTD |
| Issued Date: | February 25, 2010 |
| File Close Date: | August 13, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 101 2160 RIDGEMONT PLACE | R10 | Property Report |
| 102 2160 RIDGEMONT PLACE | R10 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | PARTIAL |
| OCCUPANCY-OLD |
PASSED
2010-08-18 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)