BP114572 - 479 Tenth (old address 477 Tenth ) - Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP114572 - 479 Tenth (old address 477 Tenth ) - Scanned
Neighbourhood: Harewood    
Street Address: 479 Tenth (old address 477 Tenth ) - Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP114572
Date Application Submitted: November 18, 2009
Application Description: Phase 2 :
New Address: 479 Tenth Street
18 Dwelling Unit Apartment Building for Youth ( 10 units) and Elders (8 units).
Residential, Group C, sprinklered, fire alarm,
1st storey = 310.50 m2 , 2nd storey 732.25 m2 , 3rd storey 163.35 m2

x reference BP115166 for the foundation permit
Application Status: COMPLETED
Permit Value: $2,100,000.00
Builder: WINDLEY CONTRACTING LTD
Issued Date: June 11, 2010
File Close Date: March 31, 2011

Associated Properties

Address Zone More
479 TENTH STREET CS1 Property Report

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

SCHEDULED
WATER CONNECTION

Pipe and connection must be visible for inspection.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PARTIAL
FINAL-OLD

Final approval as per requirements on plans.

FAILED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2011-04-01

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.