BP114530 - 3403 Barrington Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114530 - 3403 Barrington Road | |
|---|---|
| Neighbourhood: | Linley Valley |
| Street Address: | 3403 Barrington Road |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP114530 |
| Date Application Submitted: | October 15, 2009 |
| Application Description: |
FOUNDATION PERMIT only - Block A No construction beyond foundation, services to the building and perimeter drain prior to issuance of main Building Permit BP114582. Fourplex building. 3424 Ocean Mist Place, future strata lot 4 3418 Ocean Mist Place, future strata lot 5 3412 Ocean Mist Place, future strata lot 6 3406 Ocean Mist Place, future strata lot 7 |
| Application Status: | COMPLETED |
| Permit Value: | $158,711.78 |
| Builder: | HAZELWOOD HOLDINGS LTD |
| Issued Date: | November 30, 2009 |
| File Close Date: | July 22, 2014 |
| Expiry Date: | November 30, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 3418 OCEAN MIST PLACE | R6 | Property Report |
| 3424 OCEAN MIST PLACE | R6 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2014-07-22 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)