BP114482 - 3403 Barrington (parent) 3430, 3436, 3442 Ocean Mist Place -- Scanned

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP114482 - 3403 Barrington (parent) 3430, 3436, 3442 Ocean Mist Place -- Scanned
Neighbourhood: Linley Valley    
Street Address: 3403 Barrington (parent) 3430, 3436, 3442 Ocean Mist Place -- Scanned
Type of Application: Commercial / Multi / Industrial
File Number: BP114482
Date Application Submitted: October 15, 2009
Application Description: Rockwood Estates - Phase 1 of 4 Phases, 12 unit sprinklered multi-family development with 1 Duplex, 2 Triplexes and 1 Fourplex.
Phase 1 consists of 1 Triplex (Block B), Site Servicing & Landscaping.

Block - B - Triplex - sprinklered two storey on crawlspace / slab c/w attached garage. 1 hr FRR/FS @ party walls,
3442 Ocean Mist Place, unit type B, slab c/w attached garage. GFA 171.07 m2 + 27.07 m2 garage.
3436 Ocean Mist Place, unit type D, GFA 195.82 m2 + 27.07 m2 garage.
3430 Ocean Mist Place, unit type A, GFA 204.33 m2 + 27.07 m2 garage.
Application Status: COMPLETED
Permit Value: $597,541.88
Builder: HAZELWOOD HOLDINGS LTD
Issued Date: November 30, 2009
File Close Date: December 05, 2011

Associated Properties

Address Zone More
3442 OCEAN MIST PLACE R6 Property Report
3436 OCEAN MIST PLACE R6 Property Report
3430 OCEAN MIST PLACE R6 Property Report

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

CANCELLED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

CANCELLED
OCCUPANCY-OLD CANCELLED
OCCUPANCY-OLD FAILED
OCCUPANCY-OLD PASSED

2011-12-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.