Type of Application: | Leasehold Improvements |
File Number: | BP114463 |
Date Application Submitted: | October 08, 2009 |
Application Description: |
Tenant improvement for Unit 102 , for "Markt Artisan Deli" Group E, Retail, 95.87.m2, adding 4 sinks, kitchen, range exhaust hood, walk in fridge. Adding shelving and interior finshing. Seating for 10 seats or less. Fire separation and accessible washroom and sprinklers under the base building see reference below. BP112681 to be completed prior to occupancy. X reference bp112681. Bp112681included the following: Unit 102 created under BP112681 including accessible washroom, Existing Part 9 building, 197.2m2 on Main Floor Group E or D , 153.8m2 Upper floor, 2 Residential units, Existing 1 hour FRR/FS between floors. and between suites and 1 hr exposed building face, alternative solution by sprinklers for the canopy . |
Application Status: | COMPLETED |
Permit Value: | $82,000.00 |
Building Area: |
95.87 M2 1,031.94 ft2 |
Builder: | DOGWOOD MOUNTAIN HOMES LTD |
Issued Date: | November 04, 2009 |
File Close Date: | January 19, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
102 5281 RUTHERFORD ROAD | CC1 | Property Report |
101 5281 RUTHERFORD ROAD | CC1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2010-01-19 |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.