BP114421 - 3490 Hillside Ave (Parent) -- 3480 Hillside SL 1 VIS7001
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP114421 - 3490 Hillside Ave (Parent) -- 3480 Hillside SL 1 VIS7001 | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 3490 Hillside Ave (Parent) -- 3480 Hillside SL 1 VIS7001 |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP114421 |
Date Application Submitted: | September 24, 2009 |
Application Description: | for construction of a two storey, slab-on-grade single family dwelling containing a secondary suite with detached garage. One of two residences permitted on property. |
Application Status: | COMPLETED |
Permit Value: | $229,005.21 |
Building Area: |
193.24 M2 2,080.02 ft2 |
Builder: | HARVEST HOMES LTD |
Issued Date: | October 22, 2009 |
File Close Date: | August 23, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
3480 HILLSIDE AVENUE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2010-08-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.