BP114415 - 4260 Butternut Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP114415 - 4260 Butternut Drive | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 4260 Butternut Drive |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP114415 |
Date Application Submitted: | September 23, 2009 |
Application Description: |
Renovation to house c/w new roof, siding, deck, garage and Secondary Suite. Revision Feb 22/10 -Original SFD demo'd (see BP114880), house rebuilt on existing foundation with addition and secondary suite added. Revision August 16, 2011 Delete Secondary Suite, Add bar sink in lieu of. Delete outside stairs off upper deck. MLB |
Application Status: | COMPLETED |
Permit Value: | $268,825.13 |
Building Area: |
227.61 M2 2,449.97 ft2 |
Issued Date: | November 30, 2009 |
File Close Date: | August 26, 2011 |
Associated Properties
Address | Zone | More |
---|---|---|
4260 BUTTERNUT DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
FAILED |
FINAL
Final approval as per requirements on plans. |
PASSED
2011-08-26 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.