BP114367 - 5346 Laguna
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114367 - 5346 Laguna | |
|---|---|
| Neighbourhood: | North Slope |
| Street Address: | 5346 Laguna |
| Type of Application: | Single / Two Family Dwelling |
| File Number: | BP114367 |
| Date Application Submitted: | September 04, 2009 |
| Application Description: |
Construction of a two storey single family dwelling on slab with attached double garage DVP00135 approved to increase maximum lot area from 35% to 40% Revision submitted Nov. 9, 2009 2009-12-14 Revision - move door and change suite separation location 1) Rough-in for future secondary suite including: - fire separation, 20min. fire rated door, exterior door, rough-in 3-piece bathroom, rough-in kitchen sink, smoke alarms, venting, etc. (secondary suite checklist attached to plans) "BUILDING PERMIT REQUIRED TO COMPLETE SUITE" 2) Moving hwt and furnace 3) Changing bedroom 3/storage room layout |
| Application Status: | COMPLETED |
| Permit Value: | $298,144.62 |
| Building Area: |
248.84 M2 2,678.49 ft2 |
| Builder: | CAREL PROPERTIES LTD |
| Issued Date: | September 23, 2009 |
| File Close Date: | April 23, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 5346 LAGUNA WAY | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
|
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
|
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
|
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
|
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2010-04-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)