BP114324 - 1135 Nelson - Bldg A
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114324 - 1135 Nelson - Bldg A | |
|---|---|
| Neighbourhood: | Townsite |
| Street Address: | 1135 Nelson - Bldg A |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP114324 |
| Date Application Submitted: | August 24, 2009 |
| Application Description: |
Nanaimo Child Development Centre - New permanent 88.6m2 portable "A", one storey sprinklered building with new washroom. A-2 major occupancy with occupant load of 10 persons. Building is "accessible" by ramps and "universal" washroom is located in adjacent portable building connected by decks and ramps to be open at the same hours . Classification changed to "D" service / office use. Dec. 11, 09 VS |
| Application Status: | COMPLETED |
| Permit Value: | $20,000.00 |
| Builder: | HEROLD ENGINEERING LTD |
| Issued Date: | September 01, 2009 |
| File Close Date: | December 23, 2009 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 1135 NELSON STREET | CS1 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
CANCELLED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2009-12-23 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)