BP114285 - 6011 Brickyard -- SFD -- SL1, VIS6888
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114285 - 6011 Brickyard -- SFD -- SL1, VIS6888 | |
|---|---|
| Neighbourhood: | Dover |
| Street Address: | 6011 Brickyard -- SFD -- SL1, VIS6888 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP114285 |
| Date Application Submitted: | August 12, 2009 |
| Application Description: |
One SFD- Two Storey , sprinklered , crawl space 6011 Brickyard -128.4 m2, garage 23.23 m2 One Duplex - Two storeys, crawl space sprinklers , one hour FRR/FS 6013 Brickyard - 127.5 m2, garage 22.3 m2 6015 Brickyard - 128.6 m2 , garage 22.3 m2 X reference Bp 114321 FOR INSPECTION ONLY for the Duplex - 6013/6015 Brickyard. |
| Application Status: | COMPLETED |
| Permit Value: | $450,000.00 |
| Builder: | BDH HOLDINGS LTD |
| Issued Date: | August 28, 2009 |
| File Close Date: | March 04, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6011 BRICKYARD ROAD | R5 | Property Report |
| 6013 BRICKYARD ROAD | R5 | Property Report |
| 6015 BRICKYARD ROAD | R5 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD |
PASSED
2010-03-04 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)