BP114175 - 838 Brookfield (parent) Phase 5 832 Brookfield SL18 VIS6689
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP114175 - 838 Brookfield (parent) Phase 5 832 Brookfield SL18 VIS6689 | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 838 Brookfield (parent) Phase 5 832 Brookfield SL18 VIS6689 |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP114175 |
Date Application Submitted: | July 08, 2009 |
Application Description: |
Phase 5 . Units 17 & 18 are two storey, sprinklered single family dwellings with attached single garages (unsprinklered). Cross reference BP111080 for On-Site Service Permit. Unit 17 -- 828 Brookfield Drive -- 207.17 m2 GFA + 42.45 m2 Garage, inspections under BP114161 Unit 18 -- 832 Brookfield Drive -- 207.17 m2 GFA + 42.45 m2 Garage, inspections under this permit |
Application Status: | COMPLETED |
Builder: | 447223 BC LTD |
Issued Date: | July 23, 2009 |
File Close Date: | January 07, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
838 BROOKFIELD DRIVE | R6 | Property Report |
832 BROOKFIELD DRIVE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
OCCUPANCY-OLD |
PASSED
2009-11-24 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.