BP114174 - 838 Brookfield (parent) Phase 6 840 Brookfield SL20 VIS6689
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP114174 - 838 Brookfield (parent) Phase 6 840 Brookfield SL20 VIS6689 | |
---|---|
Neighbourhood: | Harewood |
Street Address: | 838 Brookfield (parent) Phase 6 840 Brookfield SL20 VIS6689 |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP114174 |
Date Application Submitted: | July 06, 2009 |
Application Description: |
Phase 5 . Units 19 & 20 are two storey, sprinklered single family dwellings with attached single garages (unsprinklered). Cross reference BP111080 for On-Site Service Permit. Unit 19 -- 836 Brookfield Drive -- 174.93 m2 GFA + 37.71 m2 Garage, inspections under BP114153 Unit 20 -- 840 Brookfield Drive -- 174.93 m2 GFA + 37.71 m2 Garage, inspections under this permit |
Application Status: | COMPLETED |
Permit Value: | $250,000.00 |
Builder: | 447223 BC LTD |
Issued Date: | August 07, 2009 |
File Close Date: | January 07, 2010 |
Associated Properties
Address | Zone | More |
---|---|---|
838 BROOKFIELD DRIVE | R6 | Property Report |
840 BROOKFIELD DRIVE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
FAILED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2009-11-02 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.