BP114025 - 489 Wallace - unit 102 -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP114025 - 489 Wallace - unit 102 -- Scanned | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 489 Wallace - unit 102 -- Scanned |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP114025 |
Date Application Submitted: | May 25, 2010 |
Application Description: |
Renovation on the first storey to create a separate A2 suite (unit 102) =267m2 (area includes exit stairs). Renovation includes modifications to the front exit stairs, 45 min. FRR/FS for exit lobby, 1 hr. FRR/FS (D to A2) between stories. On the 2nd storey, 45 min. FRR/FS public corridor, 20 minute Fire protection rating for the suite doors for the Group D future suites. Separate permit for tenants required both restaurant and offices. Installation of 45 FRR/FS for roof assembly also under this permit. Renovation to the existing washrooms. Installation of Commercial cooking equipment in compliance with NFPA 96. GBA Equivalencies Report for the floor assembly & existing mezzanines. Group A Division 2, 1st storey & Group D on the 2nd floor. 3.2.2.25, building area by code = 786 m2, 1st storey , 584 m2, 2nd storey , see GBA report for mezzanines Fire alarm system . Unsprinklered. Existing building 2 storeys with mezzanines, Heritage Building. No change of previous uses. |
Application Status: | RETIRED |
Permit Value: | $65,190.00 |
Building Area: |
267.00 M2 2,873.96 ft2 |
Builder: | 0964235 BC LTD |
Issued Date: | July 09, 2010 |
File Close Date: | January 02, 2013 |
Expiry Date: | July 09, 2014 |
Associated Properties
Address | Zone | More |
---|---|---|
489 WALLACE STREET | DT7 | Property Report |
Process Steps
Task | Status |
---|---|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
FINAL-OLD
Final approval as per requirements on plans. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.