BP114021 - 575 Fitzwilliam -- Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP114021 - 575 Fitzwilliam -- Scanned | |
|---|---|
| Neighbourhood: | Downtown/Old City |
| Street Address: | 575 Fitzwilliam -- Scanned |
| Type of Application: | Commercial / Multi-Res Alteration |
| File Number: | BP114021 |
| Date Application Submitted: | May 22, 2009 |
| Application Description: |
RCMP - interior renovation includes construction of new interior partition walls, new sink fixtures in existing men & women locker rooms, removing existing plumbing. New sink upper floor coffee room, retrofitting existing HVAC and adding new ducting, new RTU & grille to accommodate new rooms. 4 new and 2 relocated sprinklers heads on main floor, 8 new and 2 relocated sprinkler heads on the upper floor. . 2009-09-21 ....Added convenience stair. Structural engineering by B. McClure. P.Eng (B1, B2). Reclassified 3.2.2.56, 2006 BCBC, 1667.7m2 Two storey office building with subsidiary warehouse area, facing 2 streets, combustible construction, sprinklered with fire alarm, 45 min. FRR for floors and supporting assemblies if of combustible construction. Revisions rec'd on Jul 30, 2009 areas are indicated by clouds on the revised copies. jb see email dated 07-30, 2009 Sealed drawings and Sch. A,B1,B2 rec'd 08-10-09 |
| Application Status: | COMPLETED |
| Permit Value: | $250,000.00 |
| Building Area: |
40.00 M2 430.56 ft2 |
| Builder: | CITY OF NANAIMO |
| Issued Date: | July 17, 2009 |
| File Close Date: | August 09, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 575 FITZWILLIAM STREET | DT2 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
|
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
|
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
|
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2011-04-27 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)