BP113972 - 5090 Uplands (parent) 6156/6158 Arlin Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113972 - 5090 Uplands (parent) 6156/6158 Arlin Place | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5090 Uplands (parent) 6156/6158 Arlin Place |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP113972 |
| Date Application Submitted: | November 05, 2008 |
| Application Description: |
Strathcona Estates - 35 unit Multi family development - Phase 5 (1 duplex strata lots 13/14) on Lot 3. This permit includes 1 sprinklered, two-storey duplex dwelling on a partial slab and a partial crawl with an attached garage. 1 hr fire separation required between units. Strata lots 13 & 14, 6156/6158 Arlin Place: 2 storey, slab-on-grade/crawlspace; 183.02 m2 gross living area + 36.23 m2 attached garage (each side). Inspections for BP113972 under this file |
| Application Status: | COMPLETED |
| Permit Value: | $367,604.45 |
| Issued Date: | December 08, 2009 |
| File Close Date: | February 03, 2011 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6158 ARLIN PLACE | R8 | Property Report |
| 6156 ARLIN PLACE | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
CANCELLED |
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
|
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2011-02-03 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)