BP113969 - 5090 Uplands (parent) 6166/6168 Arlin Place SL9,10 VIS6326
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP113969 - 5090 Uplands (parent) 6166/6168 Arlin Place SL9,10 VIS6326 | |
|---|---|
| Neighbourhood: | Rutherford |
| Street Address: | 5090 Uplands (parent) 6166/6168 Arlin Place SL9,10 VIS6326 |
| Type of Application: | Commercial / Multi / Industrial |
| File Number: | BP113969 |
| Date Application Submitted: | November 05, 2008 |
| Application Description: |
Strathcona Estates - 35 unit Multi family development - Phase 3 (1 duplex strata lots 9 & 10 ) on Lot 3. This permit includes 1 sprinklered, two-storey duplex on a partial slab and a partial crawl with an attached garage. 1 hr fire separation required between units. Strata lots 9 & 10, 6166/6168 Arlin Place: 2 storey, slab-on-grade/crawlspace; 183.02 m2 gross living area + 36.23 m2 attached garage (each side). Inspections for BP113969 under this file |
| Application Status: | COMPLETED |
| Permit Value: | $367,604.45 |
| Builder: | RATHY DOUG CUSTOM CONTRACTING |
| Issued Date: | September 02, 2009 |
| File Close Date: | June 09, 2010 |
Associated Properties
| Address | Zone | More |
|---|---|---|
| 6168 ARLIN PLACE | R8 | Property Report |
| 6166 ARLIN PLACE | R8 | Property Report |
Process Steps
| Task | Status |
|---|---|
|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
|
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
|
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
|
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
| OCCUPANCY-OLD | FAILED |
| OCCUPANCY-OLD |
PASSED
2010-06-09 |
| Map |
|---|
View in Google Earth (KML)
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

View in Google Earth (KML)