BP113934 - 5283 Rutherford
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP113934 - 5283 Rutherford | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 5283 Rutherford |
Type of Application: | Leasehold Improvements |
File Number: | BP113934 |
Date Application Submitted: | April 27, 2009 |
Application Description: |
Boardwalk on Rutherford - DAYCARE - Complete and Occupy Use Change from an Group D Part 9 building to a Group A Division 2 Occupancy, Part 3 building. X-reference BP112681/112682 for the Shell building, (to be completed prior to occupancy). Bld E, 101.08m2 - 5283 Rutherford Road - DayCare - Part 3, Accessible Building - Group A2, Sprinklered. Building class 3.2.2.27. Fire alarm required to be installed under this permit. Installation of two universal washrooms and one roughin washroom, one sprinkler head and one sink.. Occupant load maximum 41 persons. Ensure 45 min FRR exposed wall face (N,W,E), interior window water curtain (W)and sprinklered canopy by alternative solution under BP112681/112682 for spatial separation and combustible projections (W, S)and for combustible cladding (N), |
Application Status: | COMPLETED |
Permit Value: | $19,000.00 |
Building Area: |
101.00 M2 1,087.15 ft2 |
Builder: | DUECK GENERAL CONTRACTING |
Issued Date: | July 15, 2009 |
File Close Date: | September 11, 2009 |
Associated Properties
Address | Zone | More |
---|---|---|
5283 RUTHERFORD ROAD | CC1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2009-09-11 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.